This is usually because the prm file has an incorrect InputDateFormat specified for
the DB2 configuration.
Check the location of prm file used in the universe by doing a test connection.
Edit the prm file in notepad and check the format given in "USER_INPUT_DATE_FORMAT", change it to MMDDYY.
Regards,
Ashu Kapoor