Quantcast
Channel: SCN: Message List - Software Support and Maintenance
Viewing all articles
Browse latest Browse all 2823

fixed material quantity for machine setup

$
0
0

Hello.  I am looking how best to setup a fixed material quantity for scrap during the setup of a pick and place machine.

 

I see the Assembly Scrap % and Component Scrap % in the material master, but what we need is to accomodate for a fixed quantity of scrap for every order that is issued.

 

For example if I have Assembly ABC and component XYZ:

 

BOM setup:

Assembly ABC

     -Component XYZ - Qty 20

 

MM setup:

 

Assembly ABC has assembly scrap rate of 10%

Component XYZ has component scrap rate of 5%

The pick and place machine requires a fixed quantity of 8 ea - this is the quantity that I need to know where to place

 

Order 1 requires 10 ea of Assembly ABC

Assembly scrap requirement:  10 assemblies + 10% scrap = 11 assemblies

BOM requirement: 11 assemblies x 20 components = 220 components

Component scrap rate requirement:  220 components + 5% = 11 components

Fixed quantity per order:  8 components

 

Total component XYZ needed:  220 + 11 + 8 = 239 ea

 

Our current proposed solution is to add a second line on the BOM for component XYZ as a Fixed quantity, but this is very cumbersome due to the quantity of BOMs and components involved.

 

Is there a more elegant way to accomodate this fixed quantity requirement in the Material Master?  Or elsewhere?

 

Thanks!

Jeff


Viewing all articles
Browse latest Browse all 2823

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>