Hi at all,
I've got an issue during Downtime. Now i need some help. I am implement EHP7 in an ERP System. In Pahes MAIN_NEWBAS/STARTSAP_NBAS the error message show me this error:
Checks after phase MAIN_NEWBAS/STARTSAP_NBAS were negative!
Last error code set: RFC login to system SLT as host ax-swb-q06 nr 19 gwhost ax-swb-q06 gwservice sapgw19 failed with code 2 key
RFC_LOGON_FAILURE: >>>>>>>>>>> DB-Error - -206<br/> System start failed.
SID: SLT
Host: AIX ax-swb-q06
DB: DB2 for z/OS
What should i do now??? Please help!!!
Thanks in advance
Alex