Hi Guru
is there any way to bypass costing run for a HALB with BOM? I have a HALB which the BOM have value, but I dont want my HALB to be costed... i tried to change the procurement setting to F-Blank, but it turned out all my BOM get removed from the HALB. So how can I bypass the normal costing run for this HALB while not impacting on the BOM (I need to maintain the BOM with value under this HALB). Thanks.