Hi,
Did this checking rule assign into raw material master. there should be 01 / 02 checking rule assign into material master in MRP view. because 01/02 checking rule setting in OVZ9 work for external procurement ( raw material) in MRP. PP checking rule work for planned order level.
regards,
Amit Awasthi.